BPRA service & technische bulletins per fabrikant
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2018-12-17 | TB | Informational | Vigil Trade in Vigil I units | |
| 2018-10-23 | SB | Mandatory | PSB 02-2018: Inspection on some Vigil II units | |
| 2018-04-19 | SB | Mandatory | Firmware update and high altitude jumps | |
| 2017-01-30 | TB | Advisory | Vigil_Product_Advisory_01_2017 | |
| 2015-11-09 | SB | Mandatory | Vigil PSB 01-2015 Cutters manufactured March - July 2015 | |
| 2013-06-14 | SB | Mandatory | Vigil SB #09 Waterproof inspection of Vigil II | |
| 2013-06-14 | SB | Advisory | Vigil SB #10 14Hrs automatic shutdown | |
| 2011-10-20 | SB | Mandatory | Vigil SB #08 Vigil Cutters | |
| 2011-10-04 | SB | Mandatory | Vigil SB #07 Vigil Cutters | |
| 2009-10-10 | SB | Advisory | Vigil SB #05 Vigil Cutter Type 3 | |
| 2007-02-21 | SB | Advisory | Vigil SB #03 Vigil Cutters with Plastic Insert |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2017-12-18 | SB | Mandatory | Aerodyne Semi-stowless Deployment Bag Replacement Program | |
| 2012-12-01 | TB | Informational | Icon Reserve Pilot Chute Failed to Clear Side Flaps | |
| 2011-03-25 | SB | Mandatory | Aviacom Argus AAD Installation Prohibited | |
| 2011-01-14 | SB | Mandatory | Icon Skyhook Riser Tuck Tab Modification | |
| 2009-06-25 | SB | Mandatory | Icon Student S7, S8, S9 rigs | |
| 2008-01-25 | SB | Optional | Icon Container Alternate AAD Cutter Position | |
| 2007-11-27 | SB | Precautional | Icon Container Grommet Inspection | |
| 2005-03-11 | SB | Mandatory | Icon Harness Container Cutaway Cable and Cable Housing | |
| 2004-07-12 | SB | Optional | Icon Harness Leg Strap Upgrade | |
| 2004-05-01 | TB | Informational | Aerodyne Miniforce Risers | |
| 2004-05-01 | TB | Informational | Aerodyne Miniforce Tandem Risers | |
| 2004-01-01 | TB | Informational | Aerodyne Stainless Steel Adjuster | |
| 2003-07-02 | SB | Mandatory | Aerodyne Ripcord Pin |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2017-06-20 | TB | Informational | Airtec Cypres Cutter Reinforcement Kit | |
| 2017-01-26 | TB | Informational | Airtec Prolongation Cypres II lifetime from 12,5 to 15,5 years | |
| 2013-11-20 | SB | Informational | Cypres 2 units becoming non-responsive (Follow-up) | |
| 2013-01-31 | SB | Mandatory | CYPRES 2 units becoming non-responsive. | |
| 2011-04-21 | TB | Informational | Rigging Information CYPRES Loop | |
| 2010-11-22 | TB | Informational | Rigging Information CYPRES Disc | |
| 2010-10-29 | TB | Informational | Rigging Safety Notice | |
| 2008-04-21 | SB | Mandatory | Airtec recalls 798 CYPRES II units | |
| 2008-01-22 | SB | Mandatory | Actions in case of an incomplete selftest | |
| 2004-12-01 | TB | Advisory | Airtec Loop Cutter Location Recommendation | |
| 2003-08-01 | TB | Informational | Blank display after switch on | |
| 1999-04-20 | TB | Informational | New Cypres units without silver sleeve | |
| 1997-11-11 | TB | Advisory | New Cypres electromagnetic shielding sleeve | |
| 1994-01-01 | SB | Mandatory | Airtec recalls 1527 CYPRES I units |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2014-06-13 | SB | Mandatory | Argus SB AMMO130514/1 Mandatoy Functional Check-up | |
| 2011-08-05 | SB | Mandatory | Argus immediate and mandatory cutter replacement | |
| 2011-04-05 | SB | Mandatory | Argus mandatory cutter replacement | |
| 2010-12-07 | SB | Mandatory | Argus mandatory cutter replacement | |
| 2010-12-07 | SB | Advisory | Argus substandard loop washers | |
| 2010-09-05 | SB | Mandatory | Argus mandatory cutter replacement | |
| 2006-12-11 | SB | Mandatory | Argus in Mirage Systems | |
| 2006-12-02 | SB | Mandatory | Argus in Mirage Systems | |
| 2006-05-29 | SB | Mandatory | Argus fire on the ground |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2003-07-15 | SB | Mandatory | Capewell broken pins |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2019-03-30 | SB | Mandatory | Firebird PSB 2019-01 Reserve Pin Ripcord assemblies on EVO harness containers | |
| 2017-05-22 | TB | Informational | Firebird Compatibility of products | |
| 2014-01-08 | TB | Advisory | Omega Tandem Reserve Handle with handycam use | |
| 2011-03-25 | SB | Mandatory | Aviacom Argus AAD Installation Prohibited | |
| 2011-03-17 | SB | Mandatory | Omega EVO Double RSL ring | |
| 2007-02-20 | SB | Mandatory | Cutter relocation Firebird Omega | |
| 2007-02-20 | SB | Mandatory | Cutter recolation on Firebird Tandem | |
| 2005-07-18 | SB | Mandatory | Bartacks on Omega Container-System |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2011-07-27 | SB | Recommended | Icarus Canopies - NEOS hard openings |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2016-09-30 | SB | Mandatory | MarS SB_20160902_M2 AAD Cutter replacement | |
| 2015-10-06 | SB | Mandatory | MarS SB_20151006_Configuration change in the reserve parachute packing when cutting the reserve container closing loop | |
| 2015-03-03 | SB | Binding | MarS SB_20150303_Extending the lifetime of parachute containers with harness and reserves parachutes | |
| 2015-02-02 | SB | Binding | MarS SB_20150202_Extending the lifetime of parachute containers with harness and reserves parachutes | |
| 2014-12-15 | SB | Binding | Mars SB_08/12/2014_Inspection the configuration used by the connection of the main deployment bag and the pilot chute (kill-line) | |
| 2014-10-14 | SB | Mandatory | Mars SB_20141014_Clarification of PR-011 Spring Opening Band position on the packed parachute container for parachutes range PL-70 | |
| 2014-06-10 | SB | Conditional | Mars SB_M ATL-01-14_Change of the mode for extending the lifetime of emergency parachutes ATL | |
| 2014-01-03 | SB | Informational | MarS SB_20140103_Extension of basic lifetime of sport parachutes parts over 15 years � specification of conditions | |
| 2014-01-01 | SB | Mandatory | Mars SB_20140101_Failing_reserve_opening_on_some_harnesses | |
| 2013-11-27 | SB | Mandatory | Mars SB_11/11/2013_Renwal the diving performance | |
| 2013-11-11 | SB | Mandatory | Mars SB_20131110_Inspection_m2_AAD | |
| 2013-10-09 | SB | Mandatory | Mars SB_20131009_Interruption_of_diving_performance | |
| 2013-06-05 | SB | Mandatory | Mars SB_20130605_Interruption_of_diving_performance | |
| 2013-01-02 | SB | Mandatory | Mars SB_20130102_Use_of_reserve_pilotchute_PV-028 | |
| 2013-01-01 | SB | Informational | Mars SB-20130101_Extension of lifetime of Reserve Canopy WP over 15 years | |
| 2011-07-03 | SB | Informational | Mars SB_20110703_Main Risers of all design types and variants | |
| 2011-05-02 | SB | Informational | Mars SB_20110502_Extension of lifetime of Reserve Canopy PZS-92 over 15 years - specification of conditions | |
| 2010-12-12 | SB | Informational | Mars SB_20101212_Extension of lifetime of sport parachutes parts over 15 years - specification of conditions | |
| 2010-09-11 | SB | Mandatory | Mars SB_20100911_Check of Ripcord Handle Pins | |
| 2010-06-16 | SB | Optional | Mars SB_20100616_Possible use of pilot parachute PV-031-1 with ATL� 88 parachute series | |
| 2010-06-15 | SB | Informational | Mars SB_M ATL-01-10_ Alternative way of using rubber bands with ATL parachutes | |
| 2009-11-24 | SB | Conditional | Mars SB_7/11/2009_Canopy bags (containers) designed for jumps on tied canopy bag | |
| 2009-11-18 | SB | Conditional | Mars SB_M ATL-03-09_Change of ATL logbook copy issue | |
| 2009-11-16 | SB | Conditional | Mars SB_M ATL-02-09_Unification of basic lifetime of emergency parachutes line ATL-88 | |
| 2009-10-01 | SB | Informational | Mars SB_M ATL-01-09_Change of lifetime extension for emergency parachutes ATL | |
| 2009-08-12 | SB | Informational | Mars SB_4/08/2009_The inspection of the brake MarS-T Tandem parachutes | |
| 2009-06-05 | SB | Informational | Mars SB_3/06/2009_Retightening of nuts of screwing carabine | |
| 2008-08-20 | SB | Informational | Mars SB_3/08/2008_The renewal of parachute jumping | |
| 2008-08-13 | SB | Mandatory | Mars SB_2/08/2008_The suspension of parachute jumping | |
| 2008-06-01 | SB | Informational | Mars SB_M ATL-02-08_Prolongation of the ATL emergency parachutes service life | |
| 2008-06-01 | SB | Mandatory | Mars SB_M ATL-01-08_Prolongation of the packing cycle of the ATL emergency parachutes | |
| 2007-08-21 | SB | Mandatory | Mars SB_M ATL-01-07_The repairs of the ATL emergency parachutes at Users | |
| 2007-07-25 | SB | Informational | Mars SB_5/07/2007_The U-068 T Cutaway Release Adjustment | |
| 2007-07-05 | SB | Advisory | Mars SB_M ATL-01-06_The alternative technique for packing of emergency parachutes - ATL | |
| 2007-05-29 | SB | Informational | Mars SB_3/05/2007_Propack-type of wing canopies packing | |
| 2006-11-30 | SB | Informational | Mars SB_1/11/2006_Functional revicion of paraknives | |
| 2005-12-21 | SB | Informational | Mars SB_5/12/2005_Packing of reserve parachutes into containers manufactured by MarS | |
| 2005-10-25 | SB | Conditional | Mars SB_4/10/2005_Performance of inspections and checks of main canopies of the M 291 parachute systems | |
| 2005-10-17 | SB | Mandatory | Mars SB_3/10/2005_Maximum lenght of the packing period for reserve parachutes manufactured by MarS | |
| 2005-07-09 | SB | Informational | Mars SB_2/07/2005_Performance of inspections and checks of sports reserve parachutes and their parts after the elapse of the original 10-year service life | |
| 2005-06-14 | SB | Mandatory | Mars SB_1/06/2005_Functional check of opening of sports parachute containers with an MPAAD automatic safety device | |
| 2004-09-07 | SB | Mandatory | Mars SB_6/09/2004_Inspection of needles of releases | |
| 2004-07-08 | SB | Mandatory | Mars SB_5/07/2004_Inspection of student-type harnesses | |
| 2004-05-14 | SB | Advisory | Mars SB_4/05/2004_Automatic securing device MPAAD | |
| 2004-04-15 | SB | Informational | Mars SB_3/04/2004_Service life of sport rescue / Reserve parachutes and their components (panel parts with a load-bearing harness) | |
| 2004-04-01 | SB | Mandatory | Mars SB_2/04/2004_Instructions for the packing and use of the MarS I panel with harness | |
| 2003-09-09 | SB | Mandatory | Mars SB_20030909_Parachutes ATL-88/90, ATL-88/92-S inspection of the needles of the release devices | |
| 2003-01-10 | SB | Informational | Mars SB_20030110_Information for parachute equipment users | |
| 2002-04-16 | SB | Mandatory | Mars SB_20020416_Extraordinary inspections of the rescue parachutes ATL series (ATL � 88, ATL � 88/90, ATL � 88/92-S) | |
| 0000-00-00 | SB | Mars SB_ |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2011-06-24 | SB | Advisory | Installation of an AAD in Mirage Harness | |
| 2011-06-24 | SB | Advisory | Rescission of Mirage Product SB of 24/03/11 | |
| 2011-03-24 | SB | Mandatory | Aviacom Argus AAD Installation Prohibited | |
| 2004-12-01 | SB | Mandatory | Mirage AAD cutter location change | |
| 2003-04-28 | SB | Mandatory | Mirage soft reserve ripcord recall |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2017-07-31 | TB | Informational | Zodiac BS_Atom-25-63-03 | |
| 2016-08-04 | SB | Mandatory | Zodiac BS_Atom-25-002-Rev1 sticky cordura in container | |
| 2016-07-11 | SB | Mandatory | Zodiac BS_Atom-25-002 sticky cordura in container | |
| 2015-02-19 | SB | Mandatory | Zodiac BS_Atom-25-001 sticky cordura in container | |
| 2014-06-16 | SB | Mandatory | Zodiac BS_740-27-001 POD-secours-TANDEM | |
| 2012-07-13 | SB | Mandatory | Aerazur BS_25-63-02 Atom Tandem740-1 Reserve Handle | |
| 2011-04-08 | SB | Mandatory | Aerazur BS_SPP2011-01 Argus installation | |
| 2008-12-12 | SB | Mandatory | Aerazur Reserve missing slider stop rings | |
| 2007-07-31 | SB | Mandatory | Aerazur BS_25-63-34 Improvement of centre flap | |
| 2007-03-08 | SB | Mandatory | Aerazur BS_25-63-30 cutter relocation | |
| 2006-06-08 | SB | Mandatory | PdF Techno_240_BSV06001 | |
| 2006-05-06 | TB | Informational | PdF Quick3-1 packing instruction | |
| 2004-09-15 | SB | Mandatory | PdF Metal Cutaway Handles for Tandem | |
| 2004-08-23 | SB | Mandatory | PdF Atom Millenium Line deflector flap | |
| 2004-04-19 | SB | Informational | PdF SB Sticky Freebags | |
| 2003-12-19 | SB | Mandatory | PdF SB Reserve Minimax | |
| 2003-07-28 | SB | Mandatory | PdF SB techno240 | |
| 2003-01-31 | SB | Mandatory | PdF P512 flexpack | |
| 2002-07-12 | SB | Mandatory | PdF Ninja grounded | |
| 2001-02-16 | SB | Mandatory | PdF Locking slider by front attachment tape on tandem_740 | |
| 2000-04-25 | SB | Mandatory | PdF SB AT34 25_001 Atom Millenium_34 | |
| 1999-12-13 | TB | Informational | PdF Securite sur clip FXC12000 |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2018-07-19 | SB | Mandatory | PS2018-01 Softlink to be replaced on D-Bag with removable bridle | |
| 2016-11-16 | SB | Advisory | PSB#2016-02 Reserve Pin Protector Flap Snag Possibility On UPT style RSL Skyhook Pin | |
| 2016-02-24 | SB | Mandatory | PSB#2016-01 Update 2 Stainless Steel Mini Base Ring | |
| 2016-01-11 | SB | Mandatory | PSB#2016-01 Update 1 Stainless Steel Mini Base Ring | |
| 2016-01-04 | SB | Mandatory | PSB#2016-01 Stainless Steel Mini Base Ring | |
| 2015-09-16 | SB | Mandatory | Bartacking of RSL/Sky Hook lanyard | |
| 2012-04-20 | SB | Mandatory | Decelerator Reserve Lower Steering Toggles and Vortex 2 Reserve Toggles | |
| 2011-03-23 | SB | Mandatory | Aviacom Argus AAD Installation Prohibited |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2018-10-21 | TB | Mandatory | Paratec BU313 | |
| 2014-09-22 | SB | Mandatory | Paratec Unauthorized Spare Parts surfacing | |
| 2012-12-18 | SB | Mandatory | Paratec Next Reserve Loop 2012-11 | |
| 2011-03-30 | TB | Informational | Paratec AAD Statement | |
| 2009-11-11 | SB | Optional | Cutter Buffer to protect cutter and grommets | |
| 2007-02-15 | SB | Mandatory | Paratec SB Cutter Relocation | |
| 2005-09-29 | TB | Informational | Paratec Next 3-ring failure | |
| 2004-09-22 | TB | Informational | New way of reserve ripcord pin swaging | |
| 2004-09-08 | SB | Mandatory | Reserve Ripcord Pin with round swaging | |
| 2003-07-25 | SB | Mandatory | Paratec CW0301 SB |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2016-11-01 | SB | Optional | SB1559 Talon I and Telesis I ending support | |
| 2011-03-21 | SB | Mandatory | SB1548 Argus not allowed in RI Harnesses | |
| 2009-01-15 | SB | Advisory | SB1545 Approval for Vigil2 installation in RI rigs | |
| 2007-08-29 | SB | Recommended | SB1544 Aviator Container Side Gusset Velcro Mod | |
| 2004-07-12 | SB | Mandatory | SB1541 Aviator Steering Toggles | |
| 2001-06-12 | SB | Advisory | SB1540 Voodoo 2.0 update | |
| 2000-12-01 | SB | Recommended | SB1539 RSL Sleeve on Talon 2 - Telesis 2 | |
| 2000-07-18 | SB | Recommended | SB1538 Main Riser Loops without Bartacks | |
| 1999-07-21 | SB | Advisory | SB1537 Telesis 1 Reserve Risers Sleeve | |
| 1997-10-24 | SB | Recommended | SB1535 Telesis FXC12000 Reserve Activation Check | |
| 1997-09-12 | SB | Recommended | SB1533 BOC Ripcord Housing Retrofit on Telesis 2 | |
| 1997-07-07 | SB | Advisory | SB1532 Velcro-less Toggles Brake Hang-ups | |
| 1997-01-01 | SB | Advisory | SB1531 Talon+Telesis reserve bag design updates | |
| 1997-01-01 | SB | Optional | SB1530 94 Talon+Flexon 3-ring Hard Housing Retrofit | |
| 1997-01-01 | SB | Mandatory | SB1529 Telesis SOS Ripcord Mod | |
| 1995-07-21 | SB | Optional | SB1527 94 Talon RSL Pocket Mod |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2018-03-30 | SB | Advisory | Sife SB 2018-001 Upgrade reserve cover flap | |
| 2017-10-02 | SB | Mandatory | Sife SB 2017-002 Ring position on main risers | |
| 2017-09-08 | SB | Mandatory | Sife SB 2017-001 Compliance with the instructions of SIFE Owner Manual | |
| 2016-09-26 | SB | Mandatory | The possibility of a hesitation with a RAX-RSL system | |
| 2016-06-27 | SB | Mandatory | Mini d-handle in combination with chest rings |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2014-06-01 | SB | Mandatory | StrongSB34_Approved_Components_for_Strong_Tandems | |
| 2012-08-09 | SB | Optional | StrongSB33_Aerodyne_Canopy_approvals | |
| 2012-02-02 | SB | Optional | StrongSB32_Icarus_Canopy_approvals | |
| 2011-03-29 | SB | Mandatory | StrongSB31_Argus_Approval_withdrawal | |
| 2008-10-03 | SB | Mandatory | StrongSB30_MTTB_LARS | |
| 2008-10-02 | SB | Mandatory | StrongSB29_Argus_Approval | |
| 2008-10-02 | SB | Mandatory | StrongSB28_Vigil | |
| 2007-04-18 | SB | Mandatory | StrongSB26_Quasar_Pilotchute | |
| 2007-04-18 | SB | Informational | StrongSB26_PressRelease | |
| 2007-03-01 | SB | Mandatory | StrongSB25_Y_Mod_Tdm_Passenger_Harness | |
| 2006-06-02 | SB | Mandatory | StrongSB24_Tandem_Training Syllabus Addendum | |
| 2001-11-01 | SB | Mandatory | StrongSB24_Dual Hawk Tandem Flex Pin Replacement | |
| 1997-02-20 | SB | Mandatory | StrongSB22_a)Tandem_Unapproved_components_b)Service_Life |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2013-05-23 | SB | Mandatory | SPSB009 Recall of flex housings PS70104 | |
| 2013-02-08 | SB | Mandatory | SPSB008 Release Cable Trimming | |
| 2012-09-27 | SB | Mandatory | SPSB007 inspection of soft reserve handle. | |
| 2011-09-21 | SB | Mandatory | SPSB006 Final Report Service Bulletin | |
| 2011-03-22 | SB | Mandatory | SPSB006 Prohibited use of Argus. | |
| 2009-02-03 | SB | Mandatory | SPSB005 Hip ring and 4 Ring main lift web inspection | |
| 2007-02-27 | SB | Mandatory | SP RSL removal instructions | |
| 2005-12-12 | SB | Mandatory | SPSB004 Sticky red 1000d Cordura | |
| 2004-07-19 | SB | Mandatory | SPSB003 Inspection of Main Lift Webs | |
| 2003-07-22 | SB | Mandatory | SPSB002 Inspection of Main Lift Webs | |
| 2003-07-19 | SB | Mandatory | SPSB001 CW03-01 Inspection | |
| 2000-03-03 | SB | Mandatory | SP Closing Loop Retainer Modification | |
| 2000-03-03 | SB | Mandatory | SP Closing Loop Retainer Modification Rev B | |
| 2000-03-03 | SB | Mandatory | SP Closing Loop Retainer Modification Rev B2 |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2018-10-16 | TB | Informational | Informational Bulletin on Fire RSL |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2005-05-25 | SB | Mandatory | Racer harnesses restricted to round reserves only |
| Datum | Type | Status | Titel | |
|---|---|---|---|---|
| 2015-06-24 | SB | Mandatory | SB20150624 Excessive Urethane coating on Spectra reserve ripcord | |
| 2013-05-20 | SB | Mandatory | Retractable Y-Strap Modification to Tandem Student Harness | |
| 2012-11-06 | SB | Mandatory | Removal of support washer from the Reserve Staging Loop | |
| 2011-11-10 | SB | Advisory | SB20111109 Inspection Sigma Top diagonal attachment | |
| 2011-05-23 | SB | Advisory | SB20110523 Inspect Top diagonal attachment in Sport and Student rigs | |
| 2011-03-22 | SB | Mandatory | SB20110322 Argus prohibited in UPT rigs | |
| 2007-01-30 | SB | Mandatory | SB20070130 Tandem Loop style reserve | |
| 2005-05-23 | SB | Informational | SB20050523 1 Inspection of Tandem VTCIII 230505(PDSB) | |
| 2005-05-23 | SB | Mandatory | SB20050523 2 Inspection of Tandem VTCIII 230505-2 | |
| 2003-12-03 | SB | Mandatory | SB20031203 Skyhook RSL Inspection #09238 | |
| 2003-07-15 | SB | Mandatory | SB20030715 Capewell CW03-01 | |
| 2003-03-09 | SB | Mandatory | SB20030309 Removal of the Crystal Ball for Sigma Skyhook #09121 | |
| 1998-09-10 | SB | Mandatory | SB19980910 Amp Fitting (with grommet) on Breakaway Housing #09235 | |
| 1998-03-18 | SB | Mandatory | SB19980318 Automatic Riser Release Collins Lanyard Installation #09234 | |
| 1998-03-17 | SB | Mandatory | SB19980317 Double-Ended Drogue Release Riser Closing Loop #09233 | |
| 1997-07-18 | SB | Optional | SB19970718 Proper Deactivation of the RSL on a Vector Tandem #09232 | |
| 1997-05-22 | SB | Mandatory | SB19970522 Tandem Diagonal Zigzag Inspection & Reinforcement #09231 | |
| 1993-12-03 | SB | Advisory | SB19931203 Relative Workshop Vector RSL Retro-fit #09229 | |
| 1993-08-18 | SB | Recommended | SB19930818 Recommended Lifetime on Tandem Components #09228 | |
| 1993-06-21 | SB | Mandatory | SB19930621 Incorrectly Manufactured MS-22040 #09227 | |
| 1993-03-03 | SB | Mandatory | SB19930303 Mandatory AAD for Vector Tandem System #09226 | |
| 1992-05-21 | SB | Mandatory | SB19920521 Removal RSL Attachment Ring on Type-17 Mini Risers #09225 | |
| 1991-01-21 | SB | Mandatory | SB19910121 Vector Reserve Pilot Chute #09224 | |
| 1988-11-17 | SB | Optional | SB19881117 Tandem Vector Checklist #09223 | |
| 1988-08-01 | SB | Mandatory | SB19880801 Check for Incorrectly Peened Rivets on Quick Ejectors #09222 | |
| 1986-11-01 | SB | Recomm. / Mandat | SB19861101 3ring Release Periodic Maint. & Mini 3ring Deformation #09219 | |
| 1986-09-05 | SB | Advisory | SB19860905 Stow Slider in Rubber Band Attached to Center B Line #09218 | |
| 1986-07-01 | SB | Mandatory | SB19860701 Misuse of RW-2 Rings #09217 | |
| 1985-11-22 | SB | Mandatory | SB19851122 Adding a drogue system to the Tandem Vector #09216 | |
| 1985-08-01 | SB | Mandatory | SB19850801 Reinforcing Vector Tandem Main and Reserve Canopies #09215 | |
| 1985-07-17 | SB | Mandatory | SB19850717 Stabilizer Modification Vector Tandem Canopies #09214 | |
| 1985-07-10 | SB | Mandatory | SB19850710 Replace Plastic Disk Slider Stop with Metal Washer #09213 | |
| 1985-05-24 | SB | Mandatory | SB19850524 Brake Setting Modification to Tandem Vector Canopies #09212 | |
| 1985-05-23 | SB | Mandatory | SB19850523 Stabilizer Modification to Tandem Vector Canopies #09211 | |
| 1985-05-08 | SB | Informational | SB19850508 Replace Dome Slider with Trapezoidal Dome Slider #050885 | |
| 1985-01-01 | SB | Informational | SB19850101 New Dome Slider for Tandem #09208 | |
| 1984-02-15 | SB | Mandatory | SB19840215 Status of the Large 3-ring (RW-1-82; RW-1-83) #09207 | |
| 1982-02-24 | SB | Informational | SB19820224 Modify Harness to Accept a Mini-Trapezoidal Ripcord #09206 | |
| 1979-01-01 | SB | Mandatory | SB19790101 Recall of Certain Plastic Ripcord Handles #09205 | |
| 1978-09-01 | SB | Informational | SB19780901 Installation of a Wonderhog Bridle Pin #09204 | |
| 1977-12-01 | SB | Informational | SB19771201 Wonderhog Technical Update #09203 |